Monday, May 13, 2013

Portuguese to English Dictionary - Portuguese to English Translation

Portuguese to English Dictionary - Portuguese to English Translation

  • Construction contract
  • Design contract
  • Measure and value contract
  • Flood control
  • Operational check
  • Control of reservoir sedimentation
  • Monitoring the performance of (drainage system, grout curtain)
  • River control
  • Remote control
  • Coordinates
  • Modal coordinates
  • Coordimeter
  • Detonating fuse; primacord
  • Hornfels
  • Roller bits
  • Body of dam; mass of dam (Am.)
  • Test sample
  • Floating debris; floating material; trash (Am.)
  • River training
  • Density current
  • Underflow
  • Sprocket chain
  • Ice run
  • Return current; back current
  • Turbidity current
  • Power cut
  • Geological profile; geological cross-section
  • Excavation; cut
  • Drainage curtain
  • Sheet pile cut off
  • Secant pile cut off
  • Grout cut off; grout curtain
  • Core wall
  • Diaphragm
  • Elevation of top of dam; elevation of dam crest
  • Sink hole
  • Driving (of piles)
  • Dam crest; top of dam; crown of dam
  • Sill (crest of spillway)
  • Safety criteria
  • Bank storage; ground storage
  • Steam curing
  • Concrete curing
  • Water spraying of concrete
  • Watercourse
  • Intermittent stream; ephemeral stream
  • Perennial stream
  • Subglacial stream
  • Wadi
  • River course
  • Reach forming a boundary (between two countries)
  • Lower reach
  • Middle reach
  • Main branch
  • Upper reach
  • Area-volume curve (against height); area-capacity curve
  • Depth-area curve; height-area curve
  • Depth-volume curve; height-volume curve
  • Calibration curve
  • Contour line; contour
  • Flow duration curve
  • Drawdown curve
  • Backwater curve
  • Saturation curve
  • Interception curve
  • Mass flow curve; cumulative flow curve; mass curve; summation curve; integrated
  • Density/moisture content curve
  • Grading curve; particle size distribution curve; grain size distribution curve
  • Flow rating curve; stage-discharge curve
  • Shell curves; hill curves
  • Overall cost
  • Total present worth
  • Break-even cost
  • Incident detection
  • Deterioration of dam
  • Open face blasting
  • Smooth blasting
  • Coyote blasting (Am.)
  • Row shooting
  • Trial blasting
  • Rotation firing
  • Underwater blasting
  • Muffling; deep blasting
  • Shooting; blasting; pop shooting
  • Controlled blasting; directional blasting
  • Blaster; exploder
  • Firing; initiating
  • Day of maximum demand
  • Joint
  • Velocity profile
  • Rain days
  • Lift
  • Jet diffusion
  • Thermal expansion
  • Dilatometer
  • Particle size
  • Maximum aggregate size
  • Optimum sizing of supply works
  • Fall in water level
  • Dike; dyke (Am.); levee (Am.)
  • Flood embankment; levee (Am.); flood bank
  • Flood wall
  • Strike; trend
  • No English equivalent (project design and construction supervision)
  • Site supervision
  • General arrangement of works; layout of works
  • Arrangement
  • Waterstop; water bar; sealing strip
  • Energy dissipation
  • Energy dissipator
  • Focal distance
  • Buttress spacing; distance between buttress centres
  • Laser distantiometer
  • Distortion
  • Distribution of rainfall (monthly)
  • Wandering (of a river)
  • Division of liability
  • Watershed; divide (Am.)
  • Tender documents
  • Water-borne disease
  • Sink hole
  • Dolomite
  • Feed regulator
  • Water regulator
  • Weigh-batcher
  • Drainage collector
  • Sand drain
  • Toe drain
  • Drilled drain hole
  • Chimney drain
  • Drain pipes
  • Pressure relief pipes
  • Air duct; vent
  • Navigation lock
  • Fish lock
  • Lockage water
  • Ecologist; environmentalist
  • Power economy (the economics of energy usage)
  • Economics of water usage
  • Powerhouse building
  • Scale effect
  • Bulk effect
  • Effects of dams on environment
  • Axis of dam
  • Flight lines
  • Axis of stream
  • Axis of streambed
  • Axis of reservoir
  • Linear elasticity
  • Elastomer
  • Delay detonator
  • Isoparametric element
  • Fish lift
  • Ellipse of errors
  • Eluvium
  • Under construction
  • In operation; in service
  • Near completion
  • Basement; bottom; substratum
  • Cement rendering
  • Embedded
  • Welded joint
  • Lap joint
  • Outlet (from a lake)
  • Bulking
  • Soft loan; low interest loan
  • Buoyancy
  • Active earth pressure
  • Hydraulic thrust
  • Passive earth pressure
  • Amortization charges
  • Fixed charges
  • Overheads
  • Foreman
  • Flood discharge statistical
  • Flood discharge hydrometeorological method
  • Flood discharge theoretical
  • Construction flood; diversion flood
  • To fill
  • Filling (action)
  • To order
  • Artificial abutment; abutment block
  • Gravity abutment (not in common use)
  • Rock abutment
  • Abutment
  • Slope (of a hill or mountain)
  • Kinetic energy
  • Peak energy
  • Specific energy
  • Firm output (GWh)
  • Secondary energy; non firm energy; secondary power (GWh)
  • Potential energy
  • Engineering
  • Engineer
  • Consulting engineer; consultant
  • Project engineer
  • Interlocking
  • Rockfill
  • Reinforced rockfill
  • Pitching
  • Hand placed rockfill; hand placed riprap (Am.)
  • Selected rockfill
  • Compacted rockfill
  • Random rockfill (as placed in the works); quarry run rock (as it comes from the
  • Coursed rockfill; bedded rockfill (Am.)
  • Bulk rockfill; dumped rockfill
  • Washed rockfill
  • Uncompacted rockfill; loose rockfill
  • Accelerated test
  • Accelerated weathering test
  • Jacking test
  • Large flat jack test; LFJ test
  • Flat-jack test
  • Slump test
  • Consolidation test
  • Field test
  • Bearing test
  • Classification test
  • Shear test
  • Shear box test
  • Compaction test
  • Compression test
  • Unconfined compression test
  • Wetting and drying test
  • Hardness test
  • Accelerated ageing test
  • Bending test
  • Brittleness test
  • Immersion test
  • Laboratory test
  • Vane shear test
  • Standard penetration test (SPT)
  • Water test
  • Permeability test
  • Plate bearing test
  • Tensile test
  • Materials testing
  • Shaking table test
  • Drained test
  • Non destructive test
  • Triaxial test
  • Cofferdam
  • Stank; partial bulkhead
  • Overflow cofferdam
  • Incorporated cofferdam
  • Inlet
  • Forebay
  • Free inlet
  • Ageing of dams
  • Epicentre
  • Epigenesis
  • Dimensional equations
  • Contour interval
  • Limiting equilibrium
  • Plant; heavy equipment
  • Hired plant; hired equipment (Am.)
  • Excavation plant
  • Hoisting equipment
  • Grouting equipment
  • Handling equipment
  • Tunnelling plant
  • Earthmoving plant
  • Transportation plant; hauling equipment
  • Distantiometer (electro-optical distance measuring equipment)
  • Hydromechanical equipment
  • Dismantling equipment
  • Erection equipment
  • Vane apparatus
  • Equipment
  • On-site equipment
  • Mobile crew
  • Water equivalent (of snow)
  • Erodibility
  • Degradation (of bed)
  • Internal erosion; piping
  • Retrogressive erosion
  • Scouring
  • Fish ladder
  • Diver
  • Diving suit
  • Scale of aerial photograph
  • Intensity scale
  • Deformation scale
  • Movement scale
  • Richter scale
  • To scarify
  • Ripper
  • Shortage
  • Excavation (action)
  • Excavation in open cut
  • Full face excavation
  • Supported excavation
  • Benched excavation
  • Trench excavation
  • Excavation in bulk; general excavation
  • Underwater excavation
  • Cost and delivery period
  • FOB (Free On Board) price
  • Ex-works price
  • Prices effective at (a given time)
  • Unit prices
  • Fault gouge (material); infilling material
  • Prefabrication
  • Presplitting
  • Indirect loss or damage
  • Maximum loss
  • Adverse effects; nuisances
  • Bonus
  • Preparation of lift joint surface
  • Prequalification
  • Site railway
  • Fetch
  • Steel fibre
  • Glass fibre (or fibreglass)
  • Filler
  • Phyllite
  • Filter; filter zone
  • Reverse filter
  • Final set
  • Fineness (of cement)
  • Drawn steel wire
  • Plumb line
  • Physiography (geomorphology, climatology, etc.)
  • Crack; fissure
  • Cracking
  • Crack gage
  • Deflection; bending; flexural deflection
  • Flocculation
  • Floc
  • Creep
  • Cutback (volatile diluent)
  • Buoyancy
  • Fluctuation (of water level)
  • Float
  • Boom
  • Focus; hypocentre
  • Shale
  • Spring
  • Out of use; out of order
  • Shear force
  • Inertia force
  • Force majeure
  • Normal force
  • Seismic force
  • Modal forces
  • Formwork (’shuttering’ no longer in common use); form (Am.)
  • Mould
  • Shape of reservoir basin
  • Sliding formwork; slip form (Am.)
  • Travelling formwork
  • Karstic formation
  • Packing (formation of continuous ice cover)
  • Supply and installation; supply and erection
  • Scour hole
  • Photoelastic
  • Photogrammetry
  • Photosynthesis
  • Spalling; flaking
  • Fracturing
  • Hydraulic fracture
  • Tunnel face
  • Jointed foundation
  • Bed
  • Van
  • Borehole; percussion hole
  • Rotary drillhole
  • Auger hole
  • Inspection borehole
  • Drainage hole
  • Mine chamber; coyote hole
  • Grout hole
  • Blast hole
  • Split spacing (between grout holes)
  • Fuse-plug (dike, spillway)
  • Setting out line
  • Gabbro
  • Adit
  • Culvert
  • Gallery
  • Tunnel
  • Access tunnel
  • Low pressure tunnel
  • Power tunnel
  • Headrace tunnel
  • Drawoff tunnel
  • Adit; drift
  • Tailrace tunnel
  • Busbar gallery; busbar tunnel
  • Valve gallery
  • Aqueduct
  • Aeration gallery
  • Diversion tunnel
  • Drawoff culvert
  • Drainage gallery
  • Expansion gallery
  • Grout cell; grout compartment; grouting gallery
  • Inspection gallery
  • Scour culvert
  • Spillway tunnel
  • Cable gallery
  • Transformer hall; transformer gallery
  • Diversion aqueducts
  • Overflowing; overtopping
  • Gammagraphic examination
  • Bar hooked at one end
  • Quality insurance
  • Gorge; ravine
  • Dissolved gases
  • Frost; hoar frost
  • Glacier
  • Anchor ice
  • Floating ice
  • Frazil; frazil ice (Am.)
  • Frazil slush; slush of frazil
  • Frost; freeze
  • Geodesy
  • Engineering geology
  • Geomembrane
  • Geotextile
  • Non-woven geotextile
  • Woven geotextile
  • Knitted geotextile
  • Gneiss
  • Water hammer
  • Cultivator
  • Fine screen; fine rack (Am.)
  • Coarse screen; coarse rack (Am.)
  • Screen; trashrack (Am.)
  • Hydraulic gradient
  • Large dam
  • Magnitude
  • Grading; particle (grain) size distribution
  • Continuous grading
  • Gap grading
  • Degree of consolidation
  • Intensity grade
  • Degree of freedom
  • Degree of saturation
  • Greywacke
  • Gravimetry
  • Gravimeter
  • Grate
  • Strike
  • Unofficial strike; wildcat strike (Am.)
  • Grid roller
  • Rough terrain crane
  • Self propelled crane
  • Crane
  • Unit undergoing maintenance
  • Unit undergoing repair
  • Spare unit; standby unit
  • Lock keeper
  • Guard rail
  • Winding drum; winch
  • Tower crane
  • Travelling crane
  • Lorry-mounted tower crane
  • Tracked crane; crawler crane
  • Wheeled crane
  • Ringer crane
  • Gunite
  • Hammer-grab
  • Drill rod
  • Form hanger
  • Hydration of cement
  • Hydrophone
  • Hydrogeology
  • Flood hydrograph
  • Hydrograph
  • Unit hydrograph
  • Hydrology
  • Hygrometer
  • Hypolimnion
  • Assumption; hypothesis
  • Design assumption
  • Peak hours
  • Hours of sunshine
  • Off-peak hours
  • Immersed; submerged
  • Setting out (of the works)
  • Inauguration
  • Economic impact (of environmental factors)
  • Slope
  • Downstream slope
  • Batter (sometimes wrongly termed ’slope’)
  • Inclined
  • Inclinometer; tiltmeter
  • Air entraining agent
  • Compensation; indemnity
  • Compensation for temporary land occupation
  • Indemnity
  • To indemnify
  • Compression index
  • Consistency index
  • Density index (formerly relative density)
  • Liquidity index
  • Plasticity index
  • Void ratio (ratio of the volume of voids to the volume of solids)
  • Infiltration
  • Initial set
  • Asphalt grouting (of rockfill)
  • Packer grouting
  • Joint grouting
  • Anchor grouting
  • Consolidation grouting
  • Contact grouting
  • Pressure grouting (for watertightness)
  • Cavity grouting; backfill grouting
  • Resin grout
  • Stage grouting
  • Grouting
  • Air content
  • Cement content
  • Dissolved oxygen content; dissolved oxygen concentration
  • Moisture content (concrete)
  • Water content (soil) (formerly moisture content)
  • Purlin
  • Reinforced earth
  • Top soil
  • Earth; soil
  • River terrace
  • Earthworks
  • Embankment; earth or rockfill platform
  • Earthquake; seism
  • Foundation of dam
  • Impervious soil
  • Original ground; ground surface
  • Pervious (impervious) soil (ground)
  • Loose soil
  • Centrifuge test
  • X-ray examination
  • Drill core (sample); test core sample
  • Surface texture
  • Till
  • Draft; draught; head
  • Ground anchor; rock anchor; tendon
  • High level intake
  • Streambed intake
  • Low level intake
  • Intake with automatic flushing
  • Controlled inlet
  • Intake
  • Vent; orifice; opening
  • Diversion intake
  • Multi-level intake
  • Mid-level intake
  • Tapping point
  • Surface intake
  • Side intake
  • Submerged intake
  • Overturning; tilting
  • Acoustic tomography
  • Radar tomography
  • Grout cap
  • Surveying
  • Surveyor
  • Decant tower
  • Multi-level drawoff tower
  • Drawoff tower; intake tower (Am.)
  • Workability
  • Additional works
  • Site investigation; site exploration
  • Preliminary works
  • Tracer
  • Tension
  • Auger; bucket auger
  • Stress path
  • Ski jump; flip bucket
  • Sharp transition
  • Gradual transition
  • Disease carrier
  • Conveyor
  • Bucket conveyor
  • Equipment for placing concrete by compressed air
  • Belt conveyor
  • Sediment transport; solids transport
  • Bed load transport
  • Suspended load transport
  • Data processing
  • Foundation treatment
  • Tractor
  • Wheeled dozer; turnadozer
  • Backfiller
  • Bracing (diagonal)
  • Stretch (of a river)
  • Reach
  • Train
  • Bin; hopper
  • Global positioning system (GPS)
  • Trilateration
  • Tail mast rail track
  • Exploratory trench
  • Gravel trap
  • Cut off trench
  • Clay filled cut off
  • Concrete cut off
  • Rock trap
  • Trolley
  • Slump cone
  • Vent pipe; air duct; air vent
  • Feed pipe
  • Return pipe
  • Draft tube, suction tube (pipe)
  • Piezometer tube
  • Sleeve pipe
  • Perforated tube
  • Stand pipe piezometer
  • Decant pipes
  • Pipework
  • Bypass pipe
  • Tuff
  • Tufa (from a calcareous spring)
  • steel lined tunnel, armoured tunnel
  • Scour tunnel
  • Draft tunnel
  • Pressure tunnel
  • Turbidity meter
  • Confined eddy
  • Free eddy
  • Surface eddy
  • Eddy
  • To turbine under a head of...
  • Peat; loam
  • Survey team
  • Shift (two or three shift working)
  • Humidity
  • Surface moisture
  • Run-of-river power station; power station with daily or weekly storage
  • Power station with annual storage
  • Locally controlled power station
  • Remotely controlled power station
  • Base load power station; base load plant (Am.)
  • Peak load power station; peaking plant (Am.)
  • Unattended remotely controlled power station
  • New plant
  • Power stations in cascade
  • Series of power stations; chain of powerplants (Am.)
  • Wear
  • Usefulness of a project
  • Use
  • Development; exploitation (e.g. water resources, tidal power)
  • Wave
  • Wagon
  • Steep-walled valley
  • Buried valley
  • Small valley; dale
  • Gutter
  • Ditcher; trench excavator
  • Present worth
  • Eigenvalue; natural frequency
  • Discounted value
  • Wedge gate valve; sluice valve
  • Butterfly valve
  • Needle valve
  • Pressure relief valve
  • Bypass valve
  • Mushroom valve; open chamber needle valve
  • Drain valve; scour valve; wash-out valve
  • Self-closing valve
  • Jet flow gate
  • Hollow jet valve; hollow core valve (Am.)
  • Silt trap scour gate
  • Sand trap scour gate
  • Guard gate; guard valve
  • Air valve (for release of air)
  • Automatic regulating gate; automatic regulating valve
  • Service valve
  • Howell-Bunger valve
  • Rotary valve; sphere valve
  • Pressure reducing valve
  • Bay
  • Span
  • Water vapour
  • Variation of rainfall (monthly, yearly)
  • Varve (fine cyclic lake deposit)
  • Inflow
  • Yearly flow; daily flow
  • Limiting discharge (minimum discharge at which bed movement begins)
  • Flood flow
  • Minimum flow
  • Design flow
  • Interception factor
  • Intercepted flow (m3/s)
  • Groundwater flow
  • Drain discharge
  • Outflow
  • Specific yield (l/s/km2)
  • Flow expressed as a ratio of mean flow
  • Influenced flow
  • Instantaneous flow
  • Maximum utilizable flow
  • Mean flow
  • Gauged flow
  • Natural flow
  • Rated flow (turbine or pump)
  • Firm discharge; guaranteed flow; dependable discharge
  • Observed flow
  • Regulated flow
  • Compensation water
  • Residual flow
  • Sediment load
  • Sediment inflow; sediment yield
  • Suspended sediment load; suspended load; suspended sediment (Am.)
  • Bed load; bed load sediment (Am.)
  • Total sediment load; total solids load
  • Flow; discharge; yield
  • Waterstop; water bar; Sealing strip
  • Vena contracta
  • Tracked vehicles; crawler vehicles
  • Critical velocity
  • Wave velocity
  • Water velocity
  • Mean velocity
  • Air valve (to permit entry of air)
  • Photoelastic coating
  • Registration
  • Sunshine
  • Inspection
  • Underwater inspection
  • Instrumentation (of something)
  • Constructional plant; construction plant; construction facilities
  • Controlled release facilities
  • To install stoplogs; to lower stoplogs into place
  • Operating instructions
  • Flood gate operating instructions
  • Instructions to tenderers
  • Apparatus; instrumentation
  • Joint gauge; joint meter (Am.)
  • Strain gauge; strain meter
  • Instrument
  • Equipment
  • Monitoring equipment
  • Measuring equipment
  • Weathering
  • Seismic intensity
  • Economic worth of a project
  • Interface
  • Interference
  • Interpretation of results
  • Outage
  • Intersection
  • Resection
  • Intrados
  • Flooding
  • Flooded
  • List of sites
  • Inventory of water resources
  • Inventory study
  • Inverted
  • Foundation exploration; foundation investigation
  • Soil investigation
  • Geophysical investigation
  • Surface flooding irrigation
  • Flood irrigation
  • Isohyet
  • Insulation
  • Adit
  • Jet
  • Arbitration
  • Jumbo
  • Temporary opening
  • Shear joint
  • Construction joint
  • Lift joint
  • Contraction joint
  • Control joint
  • Slip joint; dismantling flange; sliding flange
  • Expansion joint
  • Isolation joint
  • Cold joint
  • Peripherical joint; perimetric joint; perimeter joint
  • Interest during construction
  • Interest on overdue payments
  • Downstream
  • Loop
  • Lake
  • Lake for recreational purposes
  • Slab
  • Bassin invert
  • Bentonite-cement grout
  • Bentonite slurry
  • Slimes
  • Aerated nappe
  • Nappe with insufficient aeration
  • Nappe
  • Free-falling nappe; free-falling jet
  • Jumbo boom
  • Placing of fill
  • Placing of concrete; pouring concrete; concreting
  • Underwater placing
  • Width of dam
  • Top width, crest width
  • Base width
  • Laterite
  • Lava
  • Washout of concrete
  • Stress-strain law
  • Similitude criteria
  • Channel; bed
  • Mobile bed
  • River channel with steep banks
  • Stable channel; stable bed
  • Flood plain
  • Streambed; river bed; main channel
  • Bedrock
  • Reading of piezometers
  • Artesian aquifer
  • Groundwater; water table; aquifer (saturated zone below groundwater level)
  • Ice lens
  • Aerial photographic survey
  • Survey of the land conditions
  • Topographic survey
  • To measure the dimensions
  • Form tie
  • Hydraulic binder
  • Insurance cover
  • Catchment boundary
  • Easement boundary
  • Shrinkage limit
  • Liquid limit
  • Plastic limit
  • Safety limit
  • Excavation line; base of the excavation
  • Atterberg limits
  • Telemetering water level indicator
  • Water level recorder
  • Water level indicator; staff gauge
  • Rake (for cleaning a screen); trashrack cleaning machine
  • To clean a screen
  • To clear a slope
  • Clearing
  • Site clearance
  • Sand blasting
  • Baseline
  • Springing line (of intrados or extrados)
  • Flow line; streamline
  • Line of seepage; seepage path
  • Setting out line
  • Narrow gauge railway
  • Energy line; energy grade line (EGL) (Am.)
  • Equipotential line
  • Piezometric line; hydraulic grade line (HGL) (Am.); pressure grade line (PGL)
  • Liquefaction
  • Smooth
  • Bending schedule
  • Leaching of cement
  • Uneconomic site
  • Considered site
  • Site
  • Location of dam
  • Breeding ground; breeding place
  • Jack
  • Embankment, fill
  • Shoulder (upstream or downstream); shell (Am.), fill
  • Front embankment
  • Side embankment
  • Rock mass
  • Strong motion seismograph
  • Converted timber
  • Squared timber
  • Structural timber
  • Veneer
  • Lumber
  • Timber
  • Maximum credible earthquake (MCE)
  • Reference grid
  • Mesh
  • Placing nozzle
  • Air hose
  • Manifold
  • Pressure gauge; pressure meter; manometer
  • Routine maintenance
  • Routine overhaul; preventive maintenance
  • Manpower; labour force
  • Inundation map
  • Architectural model
  • TBM Tunnel Boring Machine; shield, tunneling machine
  • Full face machine
  • Machinery
  • Flood marker
  • Bench mark (B.M.)
  • Ordnance bench mark
  • Boundary marker; boundary monument
  • Tsunami; seismically generated sea wave
  • Marl
  • Shore
  • Bank
  • Reservoir slope
  • Hammer; ram; monkey
  • Hammer drill
  • Air drill; jackhammer
  • Added mass
  • Cementitious material
  • Density (of solid particles)
  • Density (of soil) (formerly bulk density; wet density)
  • Density of saturated soil
  • Density of dry soil (formerly dry density)
  • Bituminous mastic
  • Gin; crab; derrick
  • Woodland; forest
  • Boulder
  • Pervious materials
  • Cohesive material
  • Borrow material
  • Quarry material
  • Tunnel spoil, tunnel muck
  • Erodible material
  • Excavated material
  • Granular material
  • Cohesionless material
  • Non-woven material
  • Screenings
  • Mobile equipment
  • Woven material; woven fabric
  • Knitted material
  • New plant; new equipment (Am.)
  • Coupling matrix
  • Damping matrix
  • Mass matrix
  • Stiffness matrix
  • Rock matrix
  • Probable maximum flood (PMF) (in American usage, distinction is made
  • Largest recorded flood
  • Meander
  • Rock mechanics
  • Fluid mechanics
  • Soil mechanics
  • Collapse mechanism; failure mechanism
  • To make a snow survey
  • Seepage measurement
  • Deformation measurement
  • Joint measurement; crack opening measurement
  • Stress and pressure measurement
  • Flow gauging; flow measurement
  • Differential measurement
  • Displacement measurement
  • Contract measurement and payment
  • Initial measurement
  • Payment line
  • Float measurement
  • Chemical flow gauging
  • Earthquake measurement
  • Actual quantities; measured quantities
  • Protective measures
  • Safety measures
  • Air meter
  • Membrane densimeter
  • Settlement device, settlement gauge
  • Volumeter
  • Nucleodensimeter
  • Quantity surveyor
  • Environment
  • Curb; kerb
  • Chemical control methods
  • Upstream membrane
  • Curing membrane
  • Dip
  • Thermocline
  • Arch-cantilever method
  • Austrian tunnelling method
  • Finite difference method
  • Slices method (slope stability)
  • Initial stress method
  • Alignment method
  • Analysis method
  • Downstream method of construction
  • Upstream method of construction
  • Centreline method of construction
  • Finite element method
  • Trial load method
  • Incremental method
  • Hydrometeorological method
  • Probabilistic design method
  • Geophysical methods
  • Mica schist
  • Sliding micrometer
  • Mylonite
  • Levelling staff
  • Open-graded bituminous concrete
  • Dense-graded bituminous concrete
  • Cold premix; bituminous cold mix
  • Bituminous hot mix
  • Grout mixer
  • High speed mixer
  • Site installation
  • Analog model
  • Rainfall-runoff model
  • Distorted model
  • Fixed-bed model
  • Mobile-bed model; movable-bed model
  • Form of tender
  • Structural model
  • Hydraulic model
  • Mathematical model
  • Small scale physical model
  • Climatic modification
  • Topographical change
  • Shear modulus
  • Deformation modulus
  • Modulus of elasticity; elastic modulus; Young’s modulus
  • Fineness modulus
  • Modulus of subgrade reaction
  • Bulk modulus
  • Grinder
  • Bar mill
  • Ball mill
  • Hammer mill
  • Watering; sprinkling (for earth-works)
  • Current meter
  • Overturning moment
  • Dynamic monitoring
  • Erection; assembly
  • Upstream
  • Capital cost
  • Ground moraine
  • Terminal moraine
  • Lateral moraine
  • Motor grader
  • Ground motion
  • Free-field motion
  • Peak ground motion
  • Near-field motion
  • Seismic motion
  • Change of course
  • Shifting of the bed; shifting of the main channel
  • Penalty
  • Training wall; guide wall
  • No English equivalent (a cut off wall extending for an appreciable distance into
  • Wing wall
  • Retaining wall
  • Lock wall
  • Sheet pile wall
  • Baffle wall
  • Toe wall; foot wall (Am.)
  • Wave wall
  • Watermilfoil
  • At the planning stage
  • At the design stage
  • Pier nose
  • Springing
  • Springing of extrados
  • Springing of intrados
  • Laitance
  • Power boating
  • Sailing
  • Pleasure boating
  • Fishery requirements
  • Reinforcing gussets
  • Levelling instrument
  • Phreatic surface; water table; groundwater level
  • Water level
  • Tailwater level
  • Maximum flood water level
  • Headwater level
  • Priming level
  • Reservoir level
  • River stage; river level
  • Price level
  • Retention water level; top water level; normal top water level; full supply level;
  • Minimum operating level; top of inactive storage (Am.)
  • Piezometric elevation (level)
  • Grader
  • Levelling
  • Nodal point; node (arches and cantilevers)
  • Name of dam
  • Puddle clay core
  • Core; impervious core; impervious zone (inclined, vertical)
  • Number of sets; number of units
  • Outlet works
  • Sealing works
  • Substantial completion
  • Fish facility (Am.)
  • Completion
  • Works
  • Ancillary works; appurtenant works
  • Associated works (bridge, access road, etc.)
  • Supply works (Am.)
  • Storage facilities
  • Diversion works
  • Storage facilities and collecting works
  • Permanent works
  • Power facilities
  • Main works
  • Temporary works
  • No English equivalent
  • Monitoring survey
  • To make a closed traverse survey
  • To choke water intakes; to obstruct water intakes
  • Reflux valve; non return valve
  • Flap (on a radial gate)
  • Flap valve
  • Flap gate
  • Tilting gate; oscillating flashboard
  • Packer
  • Automatic tilting gate
  • Inflatable packer
  • Flood wave
  • Shear wave
  • Rejection surge (induced by rapid closure of a power canal)
  • Surface wave
  • Reflected wave
  • Seismic wave; shock wave
  • Solitary wave
  • Swell (long period)
  • Operation at part load
  • Operation at full load
  • Reservoir operation
  • Surveyor (using a surveying instrument); instrument man (Am.)
  • Earthmoving plant operator
  • Plant operator
  • Instruction to commence work; notice to proceed (Am.)
  • Project organization; jobsite organization
  • Orifice
  • Sharp edged orifice
  • Bellmouth orifice
  • Oscillograph
  • Shovel
  • Joint pattern
  • Monthly payment
  • Instrument panel
  • Magazine (bunker) for explosives
  • Protected area
  • Landscaping
  • Pallet
  • Pot hole (in the rock bed of a river); swallow hole
  • Stereo pair
  • Thermo-couple
  • Stoppage for yearly overhaul
  • One layer asphaltic facing
  • Multiple layer asphaltic facing
  • Sloping upstream face
  • Face
  • Parapet wall; parapet
  • Site appraisal
  • Project appraisal
  • Diaphragm wall
  • Grout diaphragm wall
  • Log pond (Can.)
  • Nature reserve
  • Caravan site
  • Footbridge
  • Floating debris pass
  • Fish pass; fishway (Am.)
  • Decking
  • Cement paste
  • Vibrating pad
  • Paving machine; slope paving machine; facing machine
  • Toe of dam; downstream toe of dam
  • Heel of dam (concrete dams); upstream toe of dam (others)
  • Embedded parts
  • Spare parts
  • Ashlar
  • Cobbles; pebbles
  • Set
  • Flash set
  • Direct pendulum; plumb line
  • Inverted pendulum
  • Optical pendulum
  • Drum screen
  • Shaking screen
  • Vibrating screen
  • Screen
  • Penetrometer
  • Percentage of storage
  • Steady; seepage
  • Underseepage
  • Seepage; leakage
  • Loss on ignition (cement)
  • Head loss
  • Friction losses
  • Evaporation losses
  • Spillage loss
  • Borehole log; drillhole log
  • Soil profile
  • Longitudinal profile
  • Cross-section
  • Boring
  • Rotary drilling
  • Auger boring
  • To excavate a tunnel
  • Wetted perimeter
  • Grace period; exemption period
  • Growing season
  • Recurrence interval; recurrence period; return period
  • Driest period
  • Dry spell
  • Wet spell; rainy period
  • Permeability to water
  • Permeameter
  • Perspective drawing; artist’s impression
  • Grippers
  • Dead load; dead weight (Am.); self weight
  • Unit weight (of solid particles)
  • Unit weight (of soil)
  • Unit weight of saturated soil (formerly saturated unit weight)
  • Unit weight of dry soil (formerly dry unit weight)
  • Unit weight of submerged soil (formerly buoyant unit weight)
  • Dam warden
  • Operational site staff
  • Local staff
  • Temporary workers; casual workers
  • Petrography
  • Flood peak
  • Piezoelectric
  • Piezometer
  • Open standpipe; piezometer
  • Porous tip piezometer
  • Hydraulic piezometer
  • Pneumatic piezometer
  • Tamp
  • Pillar; column
  • Pier
  • Survey station
  • Datum point; reference point
  • Spillway pier
  • Survey marker; survey monument
  • Pile fill
  • Piping
  • Slope stake; slope peg
  • Floor
  • Hollow block flooring
  • Machine hall
  • Bill of quantities
  • Schedule of prices
  • Planimetry
  • Contingency plan; emergency preparedness plan
  • Monitoring survey scheme
  • Datum point; reference point; fixed control point
  • Design directive drawing for civil works
  • Incline; inclined slope
  • No English equivalent (drawing showing excavation work)
  • Location map of monitoring points
  • Parcels plan
  • Map (scale less than 1/5 000)
  • Plan; topographical plan
  • Sowing grass seed
  • Turfing
  • Plasticizer, plasticizing admixture
  • Plastomer
  • Staging
  • Sliding floor
  • Working platform
  • Transformer compound
  • Plinth
  • Recording rain gauge; rainfall recorder
  • Rainfall recorder chart
  • Telemetering rain gauge
  • Storage rain gauge
  • Rain gauge
  • Silica fume
  • Well; shaft; pit
  • Access shaft
  • Air shaft
  • Test pit
  • Pressure shaft
  • Surge shaft
  • Relief wells
  • Drainage wells
  • Polyethylene
  • Traverse
  • Closed traverse survey plan
  • Insurance policy
  • Polyurethane
  • Mercury pollution
  • Thermal pollution
  • Spillway bridge
  • Bascule bridge
  • Overhead travelling crane
  • Flume
  • Abrading tool
  • Culvert
  • Lowest point of foundation
  • Monitoring point
  • Monitoring point for level
  • Datum point; reference point
  • Points to be monitored
  • Porosity (ratio of the volume of voids to the total volume)
  • Manhole
  • Staff man; rodman (Am.)
  • Gantry crane
  • Head mast; headtower (Am.)
  • Tail mast; tailtower (Am.)
  • Screen cleaning machine; trashrack rake gantry (Am.); trashrack cleaning machine
  • Travelling gantry
  • Setting (deep, shallow)
  • Flow gauging station
  • Stream (flow) gauging station
  • Hydrometric station; stream gauging station
  • Rain gauge station; rain gauge
  • Rain gauging station
  • Potamology
  • System peak load (MW)
  • Firm capacity; firm power; dependable capability (MW)
  • Firm peak capability (MW)
  • Installed capacity (power station)
  • Maximum output (one hour)
  • Peak load (MW)
  • Maximum input capacity (MW)
  • Maximum output capacity (MW)
  • Rated capacity (machine)
  • Potentiometer
  • Pozzolana
  • Board; plank
  • Thick plank
  • Planetable
  • Delivery period (equipment)
  • Time for completion (civil works)
  • Rainfall; precipitation
  • Snowfall
  • Average rainfall
  • CIF (Cost Insurance Freight) price
  • Contract price
  • Backfilling
  • Alkali reactivity
  • Groundwater lowering
  • Groundwater drawdown
  • Plastering
  • Settlement
  • Groundwater recharge
  • Third party claims
  • Claims
  • Concrete cover to reinforcement
  • Reconnaissance of a site
  • Land reclamation
  • Core recovery
  • Control network
  • Vertical control network
  • Horizontal control network
  • Welded steel fabric
  • Monitoring network
  • Land drainage network
  • Finger drains; strip drains
  • Flow net; flow pattern
  • Irrigation network
  • Seepage pattern
  • Flood prediction system
  • River network; stream drainage pattern (Am.)
  • Water reducing agent
  • Marker (any object used to indicate a position, e.g. boundary marker, flood
  • Temporary bench mark
  • Triangulation survey station
  • Geodetic survey station
  • Survey point; survey station
  • Global coordinates
  • Local coordinates
  • Afforestation
  • Strengthening of a dam
  • Sprinkler irrigation
  • Regime
  • Automatic recording
  • Continuous recording
  • Flood records
  • Telemetry; telemetering
  • Snow records
  • Hydrological records
  • Rainfall records
  • Overburden
  • Operating rules
  • Staff gauge; depth gauge
  • Regulations
  • Safety regulations
  • Discharge regulation
  • To trim a slope
  • Grievances
  • Refusal
  • Throw
  • Select tender list
  • Cause and effect relationship
  • Progress report
  • Feasibility report
  • Final report
  • Draft report; inception report: preliminary report
  • Provisional report; interim report
  • Road or railway diversion; road or railroad relocation (Am.)
  • Cofferdam removal
  • Repair
  • Aftershock
  • Contractor’s agent
  • Contractor’s sub-agent
  • Termination (of contract)
  • Game preserve; area preserve for hunting and shooting
  • Pumped storage reservoir
  • Direct supply reservoir
  • Storage reservoir; conservation reservoir
  • Headwaters reservoir
  • Compensation reservoir
  • Afterbay reservoir; re-regulating reservoir
  • Multipurpose reservoir
  • Regulating reservoir
  • Year-to-year reservoir
  • Afterbay reservoir
  • Secondary weirs and intakes
  • Hilltop reservoir
  • Reservoir surrounded by embankments (or dikes)
  • Uppermost reservoir
  • Reservoir for low flow augmentation
  • Flood control reservoir
  • Reservoir for power generation
  • Secondary reservoir and connecting aqueduct
  • Underground reservoir
  • Upper or lower reservoir (pumped storage scheme)
  • Basin; pool; reservoir (pumped storage scheme); pond
  • Reservoirs in cascade
  • Artificial cooling
  • Embedded pipe cooling
  • Industrial waste
  • Vinyl chloride resin
  • Epoxy resin
  • Natural resin
  • Strength
  • Bond strength
  • Fatigue strength
  • Flexural (or bending) strength
  • Penetration resistance
  • Splitting tensile strength (Brazilian test)
  • Impact strength
  • Shear strength
  • Bursting resistance
  • Resistance to damage during overtopping
  • Crushing strength
  • Puncturing resistance; punching resistance
  • Tearing resistance
  • Seismic resistance
  • Earthquake resistance (of works)
  • Cylinder strength
  • Cube strength
  • Initial strength
  • Strict liability
  • Legal liability
  • Ground response
  • Hydrodynamic response
  • Modal response; dynamic response (Am.)
  • Hydraulic jump; standing wave
  • Outlet
  • Irrigation water outlet works
  • Compensation water outlet works
  • Plotting
  • Set retarder; retarding admixture
  • To draw off; to withdraw; to abstract water
  • Shrinkage
  • Drying shrinkage
  • Thermal shrinkage
  • Back loader
  • Backhoe shovel; backacter
  • Backhoe loader
  • Re-use of excavated material
  • Lining (of canal, tunnel, shaft, etc.)
  • Facing
  • Facing
  • Non slip protection
  • Finishing coat
  • Double layer lining
  • Floor covering
  • Casing
  • Tunnel lining
  • Single layer lining
  • Tunnel steel lining (armouring); tunnel support
  • Brook; creek (Am.)
  • Stream
  • Navigable river
  • Rhyolite
  • Riprap
  • Own risk
  • Seismic risk; seismic hazard
  • Third party risks
  • Massive rock
  • Crustal rock
  • Foundation rock
  • Weathered rock
  • Extrusive rock
  • Fissured rock
  • Intrusive rock
  • Igneous rock; magmatic rock
  • Metamorphic rock
  • Plutonic rock
  • Unaltered rock; sound rock
  • Sedimentary rock
  • Self-driving roller
  • Roller
  • Sheepsfoot roller
  • Pneumatic-tyred roller
  • Flat wheel roller
  • Flat drum roller
  • Trailer type roller; towed roller
  • Articulated roller
  • Vibrating roller; vibratory roller
  • Concrete breaker; concrete splitter
  • Break up (of ice)
  • Progressive failure
  • Rock quality designation (RQD) (total percentage of pieces of drill core within a
  • Roughness
  • Rough
  • Bearing
  • Failure of dam; collapse of dam
  • Tailbay; afterbay
  • Foundation slab; foundation footing
  • Gutter
  • Scraper
  • Drought
  • Sluice section (part of a structure containing sluices)
  • No comments: